April 9th, they've been busy.

The heating unit is in the ceiling space, the evaporative air conditioning unit is mounted on the roof alongside the solar panel for the hot water.

All the ducting has ben run for both the heating and cooling - only missing walls and a ceiling.

The SS has assured me that the minor items from the frame inspection will be corrected for the next inspection (pre-plaster) next week, so all flying along, even had some of the rubble cleaned up.

Better go and sweep the wood shavings and muddy bits off the frame before they get covered over by gyprock.



2 comments:

  1. Ha ha - now you've raced to the lead! No ducts for us yet, but yours make me feel warm just looking at them.

    ReplyDelete
  2. Nah Reinsey, you guys are way ahead, we don't even have the gyprock there yet and the bricks haven't been dropped off as yet.

    Although I guess we can camp out with heat and cooling and get a camp-fire going in front of the garage :) :)

    But it is nice to see things progressing each time we go out to the site :)